Reported Nov 2, 2026 · Source: Gateway South
Fornidos Home Systems signed a lease for a purpose-built manufacturing facility at Gateway South. The approximately 55,000-square-foot regional hub is planned for 1120 South Second Street, with ARCO leading the design-build work.
Summarized from the article; the quoted lines below are from the article itself.
Read the full report at Gateway South. What the article says:
The permanent facility is planned for 1120 South Second Street.
The homebuilding company plans a regional manufacturing hub in an approximately 55,000-square-foot facility, with ARCO leading the design-build effort.
Fornidos Home Systems has signed a lease for a purpose-built manufacturing facility at Gateway South.
All St. Louis deals · More industrial deals in St. Louis · St. Louis: this week and archive
Compiled from public sources; details can differ between sources. Always verify with the linked source.